Klarna
Global BNPL: pay in 3, pay later and financing in e-commerce
What CCD, PSD2/SCA, the GDPR and DORA ask of a BNPL, and how it can onboard more merchants without standing up a new technical department.
Technical case study
The insight of the case
In the same checkout sit credit and payments: affordability and pre-contract information alongside SCA, PSPs and fraud. Treating only one side leaves gaps that merchants and supervisors notice.
Globodain reading of Spain’s Ley 16/2011, RDL 19/2018 and Directive (EU) 2023/2225

What this profile costs today
What public sources show about the sector and who competes at checkout.
20 Nov 2026
CCD2 application date in the EU; companies in the sector are preparing
EUR-Lex · Directive 2023/2225
11.6%
estimated annual growth of Spain’s BNPL market into 2025
BusinessWire · PayNXT360
SCA
strong customer authentication required of PSPs for e-payments (PSD2)
RDL 19/2018 art. 68
Companies in the sector
Global BNPL: pay in 3, pay later and financing in e-commerce
Short BNPL in 3 or 4 instalments; Spain as a priority market
Instalments at checkout; up to 36 months (WiZink group)
Pay in 3 and instalments; communicating CCD2 readiness
3/4 split and longer plans depending on the merchant
Spanish BNPL: checkout, instalments and a shopper app
The profile that combines its own scoring, merchant integrations and a credit–payments dual perimeter carries more technical surface than a generic instalment button.
A single interlocutor covers fraud, SCA, data, resilience and integrations so the team can serve more merchants.
Leadership
One conversation on credit, payments and risk instead of several vendors.
Product
SCA, scoring and plugins aligned so compliance does not kill conversion.
Technical team
Reinforcement in security, data and compliance, without replacing the team.
What changes when fraud, SCA, data and compliance stop consuming the team.
Illustrative scenario, not a forecast. Index 100 = merchants it can serve at the start of the period. Assumption: freed time goes back to product and merchant onboarding.
Each turn leaves evidence and sets the priority of the next.
Checkout, scoring, SCA, data, plugins and infrastructure.
A report leadership, risk and product can read.
We fix things alongside its team, without replacing it.
Early warning when CCD2, PSD or DORA move the roadmap.
01
SCA and credit aligned without lengthening the shopper’s payment.
02
Technical evidence ready when the rules apply.
03
Integrations and risk stop being the bottleneck.
04
Architecture and GDPR over scoring, collections and merchants.
05
One relationship covers fraud, payments, cloud and watch.
06
Technical time goes back to plans, the app and verticals.
Three ways to cover it
| In-house hire | Several vendors | Globodain as partner | |
|---|---|---|---|
| Time to start | Months of hiring | Weeks per vendor | From the diagnosis |
| Interlocutors | One, with gaps | One per area | One, for everything |
| Cost | Fixed and high | Scattered | Predictable |
| Credit + payments view | Depends on the hire | Fragmented | Complete |
| Evidence for audit | To be built | Separately | In one report |
01
Security and access on checkout, scoring and collections data.
02
Data, CI/CD, plugins, PSPs, infrastructure and code.
03
A technical reading of CCD, PSD2, GDPR and DORA on its stack.
04
Infrastructure ready for more merchants without tech debt.
05
APIs, plugins and PSPs connected securely and operably.
06
Early warning of regulatory changes that hit the BNPL.
Scope note: the mention of regulated environments describes applicable capabilities, not an accredited track record in deferred payments.
What we bring
What we do not do
Certifications and legal advice belong to authorised third parties. We provide technology support: audit, implementation and vigilance.
This study was built from public sources on the sector. If yours looks similar, Rubén Ayuso will analyse it with you and prepare one for you.
Technical study prepared by Globodain Technology Corporation from public sources on the sector. It does not describe a specific company and was not prepared with one. The companies named are examples from the sector: this does not imply a commercial relationship or their participation. Not a contract: figures and scenarios are indicative.
