Globodain

    Cloud.

    Multi-cloud, no lock-in.

    Elastic architectures on AWS, Azure, and GCP that eliminate vendor lock-in, guarantee 99.9% availability, and cut infrastructure costs by 40–60%.

    Diagnostic
    AWS
    Azure
    GCP
    Control room with cloud infrastructure dashboards under watch

    Multi-cloud | AWS, Azure, GCP

    40–60%
    Cost reduction
    99.9%
    Guaranteed uptime
    Multi
    AWS, Azure, GCP

    40–60%

    Cost reduction

    99.9%

    Guaranteed uptime

    Multi

    AWS, Azure, GCP

    EU

    Data sovereignty

    Services

    End-to-end coverage.

    01 — Assessment

    X-ray before you move.

    Infrastructure audit, dependency mapping, TCO analysis, and a migration roadmap prioritized by ROI and risk.

    TCORoadmapRisk mapping

    Includes

    • 01Service and dependency inventory
    • 02Current vs projected cost analysis
    • 03Risk map and compliance gaps
    • 04Roadmap with prioritized waves
    Providers

    The big three. No lock-in.

    We choose and combine based on workload, compliance, and cost — never by partner fee.

    Compute, data, serverless

    AWS

    • EC2
    • EKS
    • Lambda
    • RDS
    • S3
    • CloudFront
    Engineers reviewing the topology of a multi-cloud architecture

    One topology, three providers

    Workloads live where they cost less and still comply; operations stay governed from one place.

    Enterprise, hybrid, AI

    Azure

    • AKS
    • Functions
    • Cosmos DB
    • AD
    • DevOps

    Data, ML, Kubernetes

    GCP

    • GKE
    • BigQuery
    • Cloud Run
    • Pub/Sub

    99.9%

    Guaranteed uptime

    ROI

    Measurable results.

    Successive quarters: savings rise; infrastructure cost falls.

    • Average cost reduction47%
    • Average uptime99.95%
    • Deploy speed3×
    • Fewer ops tickets60%
    Process

    Assessment → continuous operations.

    Four phases with defined deliverables and rollback at every transition.

    1. Phase 01

      Assessment

      Inventory, dependencies, costs, and risks.

    2. Phase 02

      Migration

      Prioritized waves with automatic rollback.

    3. Phase 03

      Optimization

      FinOps, auto-scaling, and idle elimination.

    4. Phase 04

      Security

      Hardening, compliance, and continuous monitoring.

    Serverless

    When the workload is event-driven, serverless is the answer.

    If your workloads respond to events, our serverless architecture eliminates over-provisioning and pays only per execution.

    Serverless event-driven architecture

    Join Orbit.

    Power your cloud stack by applying multi-cloud architecture to operational processes — assessment, migration, FinOps, and security as the base of every cycle.